Exam Faciliter · Risk management (PMI-RMP®) preparation
Risk Management (PMI-RMP) Exam Preparation
Get ready for the PMI-RMP® exam. Learn what each of the five risk domains covers, follow a six-week study plan, revise the key risk formulas and practise with five free full-length simulators: 575 original questions weighted like the real exam.
- 115 questions (100 scored + 15 unscored)
- 150 minutes
- 5 domains, from risk planning to closing risks
- 575 free practice questions in five full PMPORT mocks
About the PMI-RMP certification
PMI Risk Management Professional (PMI-RMP)®, awarded by Project Management Institute (PMI). Project managers, risk analysts and specialists who lead or support risk management on projects and programs and want to show specialist risk skills.
PMI asks for project risk experience plus risk management education: typically 36 months of risk experience and 40 contact hours with a secondary degree, or 24 months and 30 contact hours with a four-year degree, within the last five years. Check PMI's current PMI-RMP handbook before applying.
What the exam covers
- Risk Identification (23%): Identification workshops, prompt lists such as PESTLE, checklists, SWOT, Delphi and premortems; assumption and constraint analysis; specific, measurable triggers; cause-event-effect risk statements; and building a useful risk register with one accountable owner per risk.
- Risk Analysis (23%): Qualitative analysis with probability and impact scales and the P-I matrix; other parameters such as urgency, manageability, detectability and connectivity; data quality and bias; quantitative analysis with EMV, three-point (PERT) estimates, decision trees, Monte Carlo simulation, S-curves and tornado charts; threats, opportunities, variability, ambiguity and overall project risk.
- Risk Strategy and Planning (22%): Reviewing the charter, business case, contracts and lessons learned; assessing the internal and external environment; turning risk appetite into measurable thresholds; tailoring the risk process to the project; writing the risk management plan; and leading risk work with stakeholders.
- Monitor and Close Risks (19%): Using performance data (earned value, trends, technical measures, agile metrics) to spot risks; reserve analysis; monitoring residual and secondary risks and the watch list; risk audits and reviews; updating the register and risk report; tracking overall risk against thresholds; closing risks and capturing lessons learned.
- Risk Response (13%): Threat strategies (avoid, mitigate, transfer, escalate, accept) and opportunity strategies (exploit, enhance, share, escalate, accept); contingency and fallback plans; cost-effective, owned responses; funding from contingency reserve; and checking that implemented responses work.
Study plan
- Week 1: Strategy and planning: Learn risk appetite versus thresholds, tailoring, the contents of a risk management plan and the roles of sponsor, risk owner and action owner.
- Week 2: Identification: Practise writing cause-event-effect risk statements, run through prompt lists (PESTLE, TECOP), assumption analysis and triggers, and design a risk register.
- Week 3: Qualitative analysis: Master probability and impact scales, the P-I matrix, urgency, manageability and connectivity, and how bias distorts ratings.
- Week 4: Quantitative analysis: Work through EMV, PERT mean and standard deviation, decision trees, P50/P80 on S-curves, tornado charts and contingency from confidence levels.
- Week 5: Responses, monitoring and closing: Learn each threat and opportunity strategy, contingency and fallback plans, secondary and residual risk, reserve analysis, audits and risk reports.
- Week 6: Full mocks: Take all five timed mocks, review every explanation and drill weak domains in practice mode until you score 75% or more consistently.
Open the risk management simulators
Frequently asked questions
Which formulas do I need for the PMI-RMP exam?
Expected monetary value (probability × impact, negative for threats and positive for opportunities), PERT mean (O + 4M + P) / 6, triangular mean (O + M + P) / 3, PERT standard deviation (P − O) / 6, variance (standard deviation squared) and decision tree expected values. You should also be able to read P50 and P80 values from an S-curve.
What is the difference between a risk threshold and a trigger?
A threshold is the limit of acceptable risk for an objective, agreed with stakeholders in the risk management plan. A trigger is a warning sign that one specific risk is about to happen, recorded in the register so the owner knows when to act.
How is the PMI-RMP different from the PMP?
The PMP covers all of project management. The PMI-RMP goes deep into one area: planning, identifying, analyzing, responding to and monitoring project risk, including quantitative techniques.
Are these official PMI-RMP questions?
No. Every question and explanation is original PMPORT practice content. PMPORT is not affiliated with or endorsed by PMI.